Monthly Archives: September 2012

Pulsotron-2 2012 results

Pulsotron-2 2012 results Continue reading

Image | Posted on by | Leave a comment

ENGINEERS REACH IGNITION CONDITIONS BY USING PULSOTRON-2 NEW DEVICES

An engineer team under  Javier Luis López operated Pulsotron-2 Z-Pinch reaching ignition conditions similar to ITER and NIF installations. Up to 16 test targets were tested. All of them were successful, as example target number 2216.11 that reached more than … Continue reading

Posted in Uncategorized | Leave a comment

Pulsotron-2 2012 results

Pulsotron-2 2012 results Continue reading

Image | Posted on by | Leave a comment